Detach & reset for a new roof

Solar Panel Removal and Reinstall

Getting a new roof with solar on it? The array, rails and wiring have to come off first and go back on right, or the new roof leaks and the system never produces the same again. We detach, label, store and reinstall the whole system, re-flash every penetration, and turn it back on. Then we prove it is producing before we leave.

Licensed & insured

Any roofer. Any installer. Any brand.

Orlando to Miami, one crew

Written quote before a panel moves

What is included

What we actually do on a solar panel removal and reinstall job

  • Full photo record of the array before a single bolt is touched
  • Panels, optimizers and rails removed, labeled and stored safely
  • Your roofer's schedule is our schedule: tear-off and reinstall line up
  • Brand-new flashed attachments on the finished roof, never the old mounts
  • Rails re-set to spec, panels re-mounted, wiring reconnected and torqued
  • System restarted, monitoring checked, production verified in writing
Solar Panel Removal and Reinstall

How it goes

Step by step

  1. 1

    Site check and written quote

    We count panels, look at the rail type and roof, and send a fixed quote.

  2. 2

    Detach

    Array comes down, documented and labeled, usually in one day.

  3. 3

    Your roofer works

    Roof gets replaced and passes its inspection with the roof clear.

  4. 4

    Reset and restart

    New attachments, rails and panels go back, and we turn the system on and verify it.

FAQ

Solar Panel Removal and Reinstall: common questions

Can my roofer just take the panels off?

Almost no roofer will, and the ones who try usually void something. The panel warranty, the inverter warranty and the roof warranty all assume a solar-licensed crew did the solar part. We handle the solar side and work directly with the roofer's schedule.

How long is the system offline?

The length of the roof job plus about a day on each side. We reinstall as soon as the roof passes its final inspection.

Do you use the old mounts?

Never. Old mounts go with the old roof. Every attachment on the new roof is new and flashed, so the roofer's warranty stays intact.

Will it need a permit?

In most Florida counties, yes. We pull the solar permit and meet the inspector so you do not have to.

Where we do this

Solar Panel Removal and Reinstall across Orlando to Miami

Get a quote

Ready when your roof is

Tell us the address, the panel count if you know it, and what is happening. You get a written quote, not a sales pitch.

Free quote

Get a written quote

Tell us what is going on with the roof or the panels. You get a real answer, not a sales call.

No obligation. We only use this to reply about your solar system.

Panels in the way? Installer gone?

One message and you have a licensed solar crew that answers. Orlando to Miami.